Hi, Sir,
Thanks for your reply.
Normally Suppose Two Pos are i had Created, Their Quantity will be 1005 and 5000
It is having N number of material Documents like 20 qty, 50 qty.
After adding the material Document , It is going to Quality inspection.
Default the Miro Never check the Whether the quality is completed or not for a particular Material Document line.
If i enable the Any push button , User need to press that button. Then I will raise an error , Which line is quality is not completed. So, if there is any possibility please inform me.
Need valuable suggestions.