No problem! Yes, I am very sure that the PR was created by MRP and sure - I will attach screenshots when I get home.
What I'm suspecting is that the requirement from a sales order is causing the material to exceed the maximum lot size during the MRP run. What do you think of this? Is this entirely possible?