Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 2806

Re: Put away Strategy "I", system should not overlook different materials bins available capacity.

$
0
0

Hi Jurgen,

 

Thanks for your reply, but i think there is some gap.

 

My Question is

 

  1. I have Done GR For 70Pcs - Material CHIP001, it will Trigger TR Automatically For GR Qty = 70pcs.
  2. Convert TR - TO at this point of time system will suggest bins for Put away.

So My Question is during TR - To conversion system is suggesting bins with same material & having capacity available in it.

 

IF Capacity is not available in same material than system always suggest new empty bin & ignores available capacity in another bins. - With Strategy "I"

 

Bin Search Requirement :-

Step - 1 - Firstly, search the storage bin that contains same material.

Step -  2 - if above search failed, then search another non-empty storage bin.

Step -  3 - IF above both points fail than system should suggest empty bin.

 

But system is not executing "Step-2", which is creating lot of problems.

Is there any way out to above Problem in put away Strategy "I".

 

Thanks & Regards,

Umesh


Viewing all articles
Browse latest Browse all 2806

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>